![]() |
Re: GPE calendar sync to Google calendar
Mine works both within the GPE and on google whichever I change both will get updated. It did take me about 10 hrs of reading, trying everything, re-flashing a few times....Worry I might have to research all over again when a new OS comes out:eek:
|
Re: GPE calendar sync to Google calendar
Quote:
|
Re: GPE calendar sync to Google calendar
I've got Outlook - Google Calendar Sync - Google Calendar - Erminig - GPE Calendar sync working OK (not tested other way yet). I do have one issue though; If I put a 1:00pm appointment into Outlook, it ends up as 12:00pm in GPE Cal.
Appointment gets to Google cal as correct time and time is correct on N810. Beats me this one. Anyone else see this? |
Re: GPE calendar sync to Google calendar
1 Attachment(s)
Quote:
I install Gene's, everything on his webpage, calendar and removed all but the Info on Tap. The last item I install was the Personal menu and soon after that I saw that the up load to igoogle was now working as only the down load was previously. |
Re: GPE calendar sync to Google calendar
I used to have it working, but then had a prbolem with it. Ended up having to remove it all. Before I try again, anyone know if there is gonig to be attempt at Google Contact Sync. now that Google have released the APIs.
Zuber |
Re: GPE calendar sync to Google calendar
I don't think this is a duplicate, but the link to finding your Google calender, in case you don't want to search around for it.
http://www.google.com/support/calend...48&ctx=sibling |
Re: GPE calendar sync to Google calendar
erminig installs but doesnt start on my n800
|
Re: GPE calendar sync to Google calendar
I had the not starting problem.
Are you connected to the web when you start it ? (that was 1 reason). Then I had a problem with one of the calendars I was using in google. Got rid of that and things were ok (for a while). Zuber |
Re: GPE calendar sync to Google calendar
I didnot have the starting problem either, and all was well with my outlook 2 google 2 gpe (via erminig) until I added a us holidays calendar from icalshare.com into outlook.
It appears there is an erminig issue with how it imports the data from google. Holidays are correct in outlook, and google - but my GPE has memorial day on saturday 5/31 (not the 26th), and fathers day on 6/19 (not on 6/15) and the like. Odd thing - Flag day 6/14 is correct... Ideas? |
Re: GPE calendar sync to Google calendar
Quote:
http://david.hautbois.free.fr/joomla...id=170&catid=3 I don't know if a cause/fix has been found. I have not seen a fix released yet. |
All times are GMT. The time now is 06:13. |
vBulletin® Version 3.8.8