maemo.org - Talk

maemo.org - Talk (https://talk.maemo.org/index.php)
-   Applications (https://talk.maemo.org/forumdisplay.php?f=41)
-   -   GPE Calendar week start day? (https://talk.maemo.org/showthread.php?t=4063)

ku4tp 2007-01-15 02:32

GPE Calendar week start day?
 
In advance - If this has already been asked and answered elsewhere, please accept my apologies. Searching has uncovered nothing.

Is it possible to change the day the calendar starts each week to Sunday? My work week goes from Sun to Sat and I would like my calendar to reflect this. I have yet to find a setting in GPE - am I missing something? I have looked at winzig and even though the config file is reflecting the desired setting, it still won't show the calendar with a Sunday start date either. Is this a system setting somewhere? Doesn't seem likely, but....

Thanks in advance!

Toby Willingham 2007-01-15 17:53

Re: GPE Calendar week start day?
 
I know that this does not address your problem but I am wondering if you could assist me with downloading this app. I am having trouble installing it. I get a message indicating installation package is in complete I am trying to install from app catalog 2006 Any help is appreciated

ku4tp 2007-01-18 15:13

Re: GPE Calendar week start day?
 
Sorry for the delay, Toby - been a busy week. As I recall, I installed GPE calendar, todo, and the rest using the reository listed in the maemo applications catalog. I'll verify that and if I'm right I'll get that info to you.


All times are GMT. The time now is 16:44.

vBulletin® Version 3.8.8