Thread
: [Fremantle Maemo5]
[Announce] Qalendar -- a replacement for the default calendar
View Single Post
gidzzz
2016-07-29 , 09:12
Posts: 282 | Thanked: 2,387 times | Joined on Sep 2011
#
187
Are you 100% sure it is caused by the CSSU update? There is a problem with the attached file, namely some entries have a malformed date, e.g. "20160711T235200Z0" (should be "20160711T235200Z"), which on my setup (still using an older version of calendar-backend) leads to only the first 30 entries being imported (31st is the first with a bad date), of which the last one is on 2016-07-04.
Try with the attached file, I fixed the dates.
Attached Files
Mondphasen_2016-2020_fixed.ics.zip
(10.9 KB, 395 views)
__________________
My Thumb mini-repository:
http://gidzzz.mooo.com/maemo/
.
Quote & Reply
|
The Following 3 Users Say Thank You to gidzzz For This Useful Post:
anab
,
sixwheeledbeast
,
ThomasAH
gidzzz
View Public Profile
Send a private message to gidzzz
Find all posts by gidzzz