View Single Post
Posts: 1,873 | Thanked: 4,529 times | Joined on Mar 2010 @ North Potomac MD
#56
Originally Posted by chenliangchen View Post
There is a clear difference between a professional design/prototype/testing/mounding/SMT/manufacturing/quality control team, and a one man product. (I have really no offence to Dirk, in fact given the man power he has done an amazing job)

It will be a commercial product from product lines, which means it will match certain requirement before if leaves the factory. It's won't be 3D printed and will have all the userability and functions tested. If we build a device, this needs to be professional.



If we can manage to find 3000 Pichlo on this planet and we will have a really nice device that can last for a long time!
So you need to find $1.5million (USD) to get this off the ground?
 

The Following User Says Thank You to mscion For This Useful Post: