View Single Post
terrencegf's Avatar
Posts: 221 | Thanked: 182 times | Joined on Jul 2007 @ Central Illinois
#5
I have (re)built gpe-calendar using the latest experimental distribution (svn20080509) at cobb.uk.net. I modified the program to start the week on Sunday, and also made the close button exit rather than iconify.

Here's how to get it. Note that my instructions make you update your GPE programs to the experimental versions. I'm not sure if you can just grab the .deb file and install, but you may as well try.

First, go into the Application Manager and add the experimental repository. In Application Manager, select the "Tools->Application catalog..." menu. Click the "New" button and enter the following information.

Code:
Catalog name: Cobb experimental
Web address:  http://www.cobb.uk.net/apt
Distribution: chinook
Components:   experimental
Click the "OK" button and allow the application list to refresh.

If you have previously installed any of the GPE applications, go to the Application Manager's "Main view" and click on the "Check for updates" button. Install the GPE updates. If you haven't installed GPE Calendar before, click on the "Browse installable applications" button instead. As of the date of this post, the current experimental version is 2.8+maemo+svn20080509-1.

NOTE: You will probably need to enable Red Pill mode to install the .deb by downloading with the browser.

Click on the attached .deb file to install the modified GPE Calendar.

EDIT!!! It looks like the first .deb was bad. Sorry! When I click the "X" close button, the gpe-calendar still runs in the background. I think it has to do with propagation of the 'delete-event'. I've uploaded a new replacement .deb. Please give it a try.
Attached Files
File Type: deb gpe-calendar_2.8+maemo+svn20080509-1_armel.deb (117.2 KB, 232 views)

Last edited by terrencegf; 2008-05-30 at 03:04. Reason: Bad .deb!!!
 

The Following 7 Users Say Thank You to terrencegf For This Useful Post: