412b: Please make the Advanced Power applet check to see if an Advanced Power back-end is already running and then work with the running one. I want to use the Mer desktop on top of the Maemo infrastructure, and I would like to see the Advanced Power applet sense that I have the Maemo AP back-end running and use that instead of the Mer back-end.