View Single Post
Posts: 152 | Thanked: 620 times | Joined on Mar 2008 @ Netherlands
#43
Originally Posted by qgil View Post
But does a thumb down mean that it should go back to extras-devel? Or just stay in extras-testing? How do we tell "still not ready for Extras but don't send it back to extras-devel"?
When a package doesn't meet the promotion criteria, the package should be removed from the queue and from extras-testing. The package will still be available through extras-devel though.

What shall we do when a developer promotes a newer version of a package which is still waiting in the QA queue? Shall I automatically drop the 'older' package from the queue and allow the new version in?

I don't think it makes sense for people to still test an older version when there is a newer version available already?
__________________
http://maemo.org/profile/view/xfade/ - maemo.org webmaster Apps.formeego.org (Apps for N9)