View Single Post
Posts: 26 | Thanked: 4 times | Joined on Dec 2009 @ Urmond, Netherlands
#805
Originally Posted by rwijnhov View Post
With me it works perfect with kerio. Let me gues it hangs you while syncing the calender? pls do following first let ik only sync two weaks. After that finishes then select 6 months. That worked for me.
It hangs while initialyzing the synchronization.

This is the output from the error log:
[14/Jan/2010 10:53:46] ASyncRequest.cpp: ActiveSyncRequest::Initialize: Unable to read request data (ContentLength: 1187, Available: 0)

Last edited by gkosters; 2010-01-14 at 09:55.