View Single Post
Posts: 341 | Thanked: 57 times | Joined on Nov 2009
#8
MfE does not work for me, but maybe that is because I already have entries in my main calendar, and the first guide mentioned in this thread requires an empty calendar in the N900 for MfE to work ..

I will try this Nuevasync method then ..