Thread
:
[Closed] The epic PR 1.2 anticipation thread
View Single Post
russo_br
2010-03-09 , 16:35
Posts: 119 | Thanked: 124 times | Joined on Jan 2010 @ Brazil
#
168
Getting deeply into the mastery of speculation... sorry in advance if I am repeating what someone already told here!
I just did a more detailed research on
bugs.maemo.org
for all bugs marked as FIXED with the Target Milestone as "5.0+", and the latest build mentioned was always 10.2010.08-XX (08 means the week and XX is the version of the build for those who don't know):
Qt 4.6.2 for Maemo got its public release at 15th Feb (week 07). Source:
http://labs.trolltech.com/blogs/2010...mo-5-released/
I am pretty sure the PR1.2 will be based on a version 10.2010.08-XX, since it was the build with the most number of builds I've found, being the latest build 10.2010.08-23 the latest (Source:
https://bugs.maemo.org/show_bug.cgi?id=9182
). 23 builds within one week doesn't seem feasible...
Anyway, week 08 was between 21 and 27st Feb... @casper27 mentioned in a previous post on this thread that last FW update took 5 weeks between the build and its release. Sure this may vary depending on how the tests go, but the bug 9182 was marked as RESOLVED/FIXED at 5th March (build 10.2010.08-23 ), last Friday... so I guess they are still including bug fixes to PR1.2.
russo_br
View Public Profile
Send a private message to russo_br
Find all posts by russo_br