Thread
:
[Closed] The epic PR 1.2 anticipation thread
View Single Post
w00t
2010-04-13 , 00:27
Posts: 1,055 | Thanked: 4,107 times | Joined on Oct 2009 @ Norway
#
1170
Originally Posted by
nMIK-3
No it doesn't. I know what PR 1.2 will bring. This is not my point.
Furthermore, use logic, and put two and two together:
two: the 1.2 SDK is out. This means (in theory) that most of the hard work is sorted and over, and it's down to crunch time.
two:
http://wiki.maemo.org/What_can_we_re..._Harmattan_.3F
- 1.2 was frozen in Febuary, it is now April. Two months of fixing, and the pace looks to be slowing down.
equals four: there will be a 1.2, and it won't be years away.
__________________
i'm a
Qt
expert and former
Jolla
sailor (forever sailing, in spirit).
if you like, read
more about me.
if you find me entertaining, or useful, thank me. if you don't, then tell me why.
w00t
View Public Profile
Send a private message to w00t
Find all posts by w00t