View Single Post
Posts: 22 | Thanked: 5 times | Joined on May 2010 @ Slovenia
#382
Originally Posted by Cargi77 View Post
All day events created in google calendar quite often show up as 2 day events on my n900 (with the original date as first day).
Same problem here, full-day events end up as two-day events in the calendar. After a quick glance, I discovered the events are stored as day1 2am - day2 1:59am. Seems like timezone issue?

EDIT: can't say for sure, but this started happening in the latter versions (or maybe since PR1.2). For some time before that, I'm pretty sure this wasn't happening.