View Single Post
Posts: 22 | Thanked: 5 times | Joined on May 2010 @ Slovenia
#162
Originally Posted by nicolai View Post
I don't use any sync application
and don't know how this work, but if the software changes the
calendar db directly my widget cannot recognize these changes.
Now you can manually update the widget by tapping the weekday
name (long 1 second tap).
The manual update is a bit tricky. If you tap on the widget and
the duration is to short, it opens the calendar ui. If it is to
long hildon-home enters the edit mode.
Would it be possible to check the events in regular intervals? You could rebuild the list of events, and if something is different, you can refresh the display. This would world event if the sync software would change the calendar DB directly. Although I think at least Erminig is using the calendar API to change the events.

Thanks again for the update, the separator is very useful.
 

The Following User Says Thank You to gasper_k For This Useful Post: