![]() |
2010-05-29
, 21:05
|
Posts: 42 |
Thanked: 10 times |
Joined on Mar 2010
|
#2
|
![]() |
2010-05-29
, 21:08
|
|
Posts: 1,091 |
Thanked: 323 times |
Joined on Feb 2010
@ ~
|
#3
|
![]() |
2010-05-29
, 21:31
|
Posts: 42 |
Thanked: 10 times |
Joined on Mar 2010
|
#4
|
![]() |
2010-05-31
, 18:59
|
|
Posts: 55 |
Thanked: 8 times |
Joined on Mar 2010
@ UK
|
#5
|
![]() |
2010-06-01
, 06:05
|
Posts: 87 |
Thanked: 26 times |
Joined on Mar 2010
@ Canada
|
#6
|
![]() |
2010-06-01
, 09:32
|
|
Posts: 41 |
Thanked: 15 times |
Joined on Oct 2009
@ UK
|
#7
|
I'm having this problem as well. I've got 3 events showing up (1 for june, 1 july and 1 september) even though i've got events loaded in between those dates. I've searched the various threads and don't seem to be able to find a solution/fix.
![]() |
2010-06-01
, 09:41
|
Posts: 37 |
Thanked: 10 times |
Joined on Mar 2010
|
#8
|
The Following User Says Thank You to phobosk For This Useful Post: | ||
![]() |
2010-06-01
, 15:55
|
|
Posts: 55 |
Thanked: 8 times |
Joined on Mar 2010
@ UK
|
#9
|
See the fix here:
http://talk.maemo.org/showthread.php...561#post678561
![]() |
2010-06-01
, 16:38
|
Posts: 37 |
Thanked: 10 times |
Joined on Mar 2010
|
#10
|
does anyone face the same issue? how can i resolve it?
is there a alternative for calendar to sync with google calendar?
or how can I export events from n900 calendar and import it into gpe calendar?
thanks.
btw, I also have the titan kernel running with ideal at 1000Hz, but the calendar issue was there before i installed this kernel.
Last edited by kangyu29; 2010-05-29 at 16:57.