![]() |
2007-10-24
, 02:04
|
Posts: 46 |
Thanked: 2 times |
Joined on Aug 2007
@ TN, USA
|
#1
|
![]() |
2007-10-24
, 19:18
|
Posts: 47 |
Thanked: 3 times |
Joined on May 2007
@ Herndon, VA, USA
|
#2
|
![]() |
2007-10-24
, 19:45
|
Posts: 46 |
Thanked: 2 times |
Joined on Aug 2007
@ TN, USA
|
#3
|
![]() |
2007-10-24
, 20:23
|
|
Posts: 118 |
Thanked: 97 times |
Joined on Jun 2007
@ France
|
#4
|
I'd love a local calendar that I could sync with my google calendar, but that's not supported currently.
![]() |
2007-10-24
, 20:42
|
Posts: 961 |
Thanked: 565 times |
Joined on Jul 2007
@ Tyneside, North East England
|
#5
|
![]() |
2007-10-24
, 21:06
|
|
Posts: 696 |
Thanked: 1,012 times |
Joined on Mar 2006
@ Asturies, Spain
|
#6
|
i installed gpe calendar and it would not close. it used alot of memory and changed the way webpages pulled up. now i need to figure out how to properly remove it from my 770.
![]() |
2007-10-26
, 15:13
|
|
Posts: 96 |
Thanked: 7 times |
Joined on Sep 2007
|
#7
|