Notices


Reply
Thread Tools
Posts: 29 | Thanked: 2 times | Joined on Dec 2007
#221
Also, after the sync set the "Last Sync Date" or something like that in the Preference menu. Next time it will go all the way through.
 
Un27Pee's Avatar
Posts: 259 | Thanked: 59 times | Joined on Feb 2008
#222
[QUOTE=
As for the auto sync not working, you can fix this yourself if you are comfortable with editing the program's files. PM me for help on this (I have already sent the info to Khertan).[/QUOTE]

I do not know if it works or not, i only wanted to know how is it suppose to work i always do manual sync even though i have check autosync, i want to verify if it works so that i do not have to go through the process of manual syncing.
__________________
Uncle Pee

T3 - IT 810
Confidence is hard to gain easy to loose impossible to regain, Pee
 
Khertan's Avatar
Posts: 1,012 | Thanked: 817 times | Joined on Jul 2007 @ France
#223
Hi,

I'm still looking at sync problem, and at this time i mainly working on the database structure, and recurrences rules parsing, as there is still some problem with some reccurence setting, as mCalendar doesn't understand all icalendar rfc which google use for the reccurency.

Why rewriting the structure ? because i m dividing the code into module
- to be able to run automatics test (Test-driven developpment)
- to be able to import and export ical file
- Divide GUI of data parsing
- prepare place for other sync
- prepare place for the future Calendar framework of Fremantle
 

The Following User Says Thank You to Khertan For This Useful Post:
briand's Avatar
Posts: 566 | Thanked: 145 times | Joined on Feb 2008 @ Tallahassee, FL
#224
tres bien! maintenez le bon travail!!

__________________
N800 / OS2008
Now running Canola-free (by invitation) since 2215 UTC 21 May 2008.
 
Posts: 29 | Thanked: 2 times | Joined on Dec 2007
#225
Khertan
Thanks for your work on mCal. It is a great app and I am definitely looking forward to your next release.
 
Un27Pee's Avatar
Posts: 259 | Thanked: 59 times | Joined on Feb 2008
#226
Thank you Khertan keep up the good work.
__________________
Uncle Pee

T3 - IT 810
Confidence is hard to gain easy to loose impossible to regain, Pee
 
Posts: 398 | Thanked: 77 times | Joined on Jul 2007
#227
khertan:
please keep up the good work i really like the app and dislike the alternatives
 
Posts: 674 | Thanked: 191 times | Joined on Mar 2008 @ Buenos Aires, Argentina
#228
Khertan,

After the last Diablo upgrade all my appointments have an one hour offset (i.e. 16:30 instead of 15:30). Nothing changed in my setup, since I restored all my previous settings.

I deleted the database and synchronized again with no differences.

What can I do?
 
bongo's Avatar
Posts: 291 | Thanked: 124 times | Joined on Feb 2006 @ Trier, Germany
#229
maybe a problem with some kind of daylight-saving-zone

in my case i've a similar problem with gpe calendar/erming/google
__________________
ongo bongo!
 
Posts: 674 | Thanked: 191 times | Joined on Mar 2008 @ Buenos Aires, Argentina
#230
No, we don't use daylight-saving-zone.

I had the same problem with GPE. That was the reason I switched to mCalendar.
 
Reply

Tags
calendar, google

Thread Tools

 
Forum Jump


All times are GMT. The time now is 09:59.