Active Topics

 



Notices


Reply
Thread Tools
shanttu's Avatar
Posts: 234 | Thanked: 281 times | Joined on Nov 2010 @ Helsinki
#561
Syncing between Google Calendar and N900 calendar have not worked for four days now. Log attached. Thanks for help in advance.
Attached Files
File Type: txt erminig_trace.txt (11.5 KB, 170 views)

Last edited by shanttu; 2011-05-24 at 13:15. Reason: typo
 
Posts: 12 | Thanked: 7 times | Joined on Oct 2009
#562
Hi all,

I'm not sure this is the best place for it, but it seems only erminig and not NG have a proper place for bug reports.

My partner has an n910, and is using erminig to sync to google calendar, where we have a shared calendar.

I have an n900 and am using ermining-ng to sync to google.

We have two problems:

1. Some events get duplicated in sync, not all, just some, and we don't see why.

2. Some events my partner syncs end up in google calendar, but never get synced to the n900. It's as if erminig-ng can't see those events at all. Looking at google I can't see any different between that event and others, they have the same kinds of options, only the date/time/where fields are different.

How can I help and debug this?
 
Posts: 12 | Thanked: 7 times | Joined on Oct 2009
#563
My partner has an n810 not an n910!
 
Posts: 20 | Thanked: 6 times | Joined on Dec 2009 @ finland
#564
Originally Posted by shanttu View Post
Syncing between Google Calendar and N900 calendar have not worked for four days now. Log attached. Thanks for help in advance.
I think that I have same issue: Since some days (4?) erminig-ng stopped to work properly. First it made my calendar totally empty on device and now I cannot make it sync all meetings, only part of meetings are synced.

-nibbe-
 
Posts: 291 | Thanked: 134 times | Joined on Dec 2009 @ North-west, UK
#565
Still working for me. Did you trying deleting and redoing the config ?
__________________
Go on, press the 'thanks' link, you know you want to
 
Posts: 12 | Thanked: 7 times | Joined on Oct 2009
#566
Originally Posted by tomchiverton View Post
Still working for me. Did you trying deleting and redoing the config ?
I just tried deleting the account through the GUI and I get this: (and the account does not get deleted):

Traceback (most recent call last):
File "/opt/maemo/usr/share/erminig/settings_ui.py", line 15, del_google_acct(widget=<hildon.Button object at 0x41eab328 (HildonButton at 0x8a1488)>, data=<hildon.Dialog object at 0x418360d0 (HildonDialog at 0x88d2f0)>)
def del_google_acct(widget, data):
id = get_google_acct_id()
account = google_accounts.get_account_by_id(id)
variables: {'id': ('builtin', <built-in function id>), 'get_google_acct_id': ('global', <function get_google_acct_id at 0x410a0b30>)}
File "/opt/maemo/usr/share/erminig/settings_ui.py", line 12, get_google_acct_id()
(model, iter) = ts.get_selected()
return model.get_value(iter, 0)
variables: {'model.get_value': ('local', <built-in method get_value of gtk.ListStore object at 0x41ea9fd0>), 'iter': ('local', None)}
TypeError: iter must be a GtkTreeIter

Where is the config stored so I can delete it manually?
 
Posts: 12 | Thanked: 7 times | Joined on Oct 2009
#567
Originally Posted by bbogart View Post
Where is the config stored so I can delete it manually?
So I deleted the .erminig.db db file, and reconfigured the program.

Upon sync (one way to google) it seems to have duplicated all my entries. Is there no duplicate event detection?

Seems in this situation (having two r/w syncs to one calendar) is not a good idea. So we'll start again from scratch, deleting the current google calendars and having only one of us be able to push events, and the other pull only.

Here is a concrete example of one failure:

I put in a new event in the shared calendar. It was a repeating event at a certain day of the week.

I synced (two way) to google.

I noticed after syncing that I messed up the end date, putting it in the next month. So I changed the end date on my n900 (looks fine in the local calendar)

I synced (two way) to google to propagate my changes.

Google still shows the incorrect end date that I initially synced.

Seems erminig has issues with events changing after they are synced.

Is this program going to continue to be actively maintained?

B.
 
Posts: 1,680 | Thanked: 3,685 times | Joined on Jan 2011
#568
Did GPE <-> google sync ever get implemented in erminig-ng or has this program become another orphan?
__________________
N900: One of God's own prototypes. A high-powered mutant of some kind never even considered for mass production. Too weird to live, and too rare to die.
 
Posts: 9 | Thanked: 5 times | Joined on Dec 2009
#569
Originally Posted by codeMonkey View Post
Hi Lorelei - I'm getting the "Bug Detected" error message whilst it's trying to sync one of my calendars. How can I figure out which event is causing it?

The stack trace takes me down as far as:
Code:
_AddMembersToElementTree with AttributeError: 'int' object has no attribute 'decode'
I think you ran into the same bug as I did. I fixed it today; the bug is at https://garage.maemo.org/tracker/ind...=702&atid=2623

It's a simple one-line fix, but nevertheless I made a package for it from my repository:

Try to add the repo by going to
http://thomas.apestaart.org/pkg/maem...ll/tao.install

then update erminig and see if you get version 0.2.12.2 from my repo ? Please tell me if that fixes the bug for you.
 

The Following User Says Thank You to thomasvs For This Useful Post:
Posts: 1,100 | Thanked: 2,797 times | Joined on Apr 2011 @ Netherlands
#570
Originally Posted by thomasvs View Post
I think you ran into the same bug as I did. I fixed it today; the bug is at https://garage.maemo.org/tracker/ind...=702&atid=2623

It's a simple one-line fix, but nevertheless I made a package for it from my repository:

Try to add the repo by going to
http://thomas.apestaart.org/pkg/maem...ll/tao.install

then update erminig and see if you get version 0.2.12.2 from my repo ? Please tell me if that fixes the bug for you.
Thomas,
I ran into some indent issues in the code which I had to correct before I could run your version. You didn't experience that yourself?
 
Reply

Tags
erminig, erminig-ng, ernie nig, google calendar, google sync, synchronization


 
Forum Jump


All times are GMT. The time now is 21:27.