|
2008-01-08
, 07:24
|
Posts: 13 |
Thanked: 0 times |
Joined on Dec 2007
|
#12
|
Hey Tim, it's not clear to me from your post what 'it' was that caused the disaster. Was it Erming? Or are you referring to the above-mentioned use of a built-in GPE/Google sync?
|
2008-01-15
, 15:42
|
Posts: 30 |
Thanked: 6 times |
Joined on Dec 2007
|
#13
|
The Following User Says Thank You to didjit86 For This Useful Post: | ||
|
2008-01-16
, 05:12
|
|
Posts: 26 |
Thanked: 2 times |
Joined on Nov 2007
@ Canada
|
#14
|
|
2008-01-16
, 07:04
|
|
Posts: 26 |
Thanked: 2 times |
Joined on Nov 2007
@ Canada
|
#15
|
|
2008-01-16
, 07:06
|
Posts: 27 |
Thanked: 0 times |
Joined on Sep 2007
|
#16
|
|
2008-01-18
, 16:25
|
|
Posts: 26 |
Thanked: 2 times |
Joined on Nov 2007
@ Canada
|
#17
|
|
2008-01-18
, 16:33
|
|
Posts: 415 |
Thanked: 44 times |
Joined on Apr 2007
@ Austin, Texas
|
#18
|
I have no idea why i have lost recurring events... that is the bigger problem.
Tim
|
2008-01-18
, 17:37
|
Posts: 479 |
Thanked: 641 times |
Joined on Dec 2007
@ Switzerland
|
#19
|
Which events are supported ?
All single and recurring events are supported, excepted recurrent events using a number of occurence limit.
|
2008-01-21
, 09:12
|
Posts: 13 |
Thanked: 0 times |
Joined on Dec 2007
|
#20
|
Other calendars under AccountA still work, but I have these two overlapping events on the same calendar, and the later event got shifted to the next day.