|
2014-09-11
, 17:49
|
Posts: 16 |
Thanked: 14 times |
Joined on May 2012
|
#152
|
The Following User Says Thank You to anab For This Useful Post: | ||
|
2014-09-11
, 17:59
|
|
Posts: 505 |
Thanked: 665 times |
Joined on Oct 2009
|
#154
|
It is my fault, corrected in Qalendar 0.9.5:
- Fixed a regression that prevented end time of events from being set properly.
- Updated the German translation.
|
2014-10-02
, 08:29
|
Posts: 203 |
Thanked: 445 times |
Joined on Mar 2010
|
#155
|
|
2014-10-17
, 14:43
|
Posts: 30 |
Thanked: 89 times |
Joined on Jan 2009
|
#156
|
This parameter [TZID] MUST be specified on the "DTSTART", "DTEND", "DUE", "EXDATE", and "RDATE" properties when either a DATE-TIME or TIME value type is specified and when the value is neither a UTC or a "floating" time.
The use of local time in a DATE-TIME value without the "TZID" property parameter is to be interpreted as floating time, regardless of the existence of "VTIMEZONE" calendar components in the iCalendar object.
|
2015-02-05
, 09:50
|
Posts: 287 |
Thanked: 618 times |
Joined on Jan 2011
@ Estonia
|
#157
|
|
2015-02-18
, 15:01
|
|
Posts: 282 |
Thanked: 2,387 times |
Joined on Sep 2011
|
#158
|
The attached file can be imported to e.g. eM Client. (Rename to .ics!) It shows the behavior of a "floating time" event: It occurs on a different time when DST is active/inactive.
When I export the whole calendar via qalendar that event does not have any time zone information. If I understand the RFC regarding time zone identifiers correctly this is not allowed unless you want it to be a "floating time" event.
Information, not contained in the [recurrence] rule, necessary to determine the various recurrence instance start time and dates are derived from the Start Time ("DTSTART") component attribute.
I guess it's possibility no. 2 because in the exported calendar before each BEGIN:VEVENT is a BEGIN...END:VTIMEZONE. The only problem is that the timezone is not used within the VEVENT.
Just noticed one strange thing about recurring events. I have an monthly event on it's every first Wednesday. So I created an event repeating monthly, interval 1, Forever, By day of week: Wed, By day of month: From beginning: 1 2 3 4 5 6 7. The event is now displayed correctly on every month's first Wednesday except when the Wednesday is the first day of the month - in that case it is not displayed by some strange reason. To check it further I created an test event that should repeat at every Wednesday 1st (like that Friday 13th rule in first post) and it just does not repeat at all... Any ideas? Bug?
The Following 15 Users Say Thank You to gidzzz For This Useful Post: | ||
|
2015-02-18
, 16:18
|
|
Posts: 505 |
Thanked: 665 times |
Joined on Oct 2009
|
#159
|
Meanwhile, there is a small update for Qalendar, 0.9.6:
- Swipe left/right in the event window for next/previous event.
|
2015-02-20
, 02:26
|
|
Posts: 282 |
Thanked: 2,387 times |
Joined on Sep 2011
|
#160
|
My Thumb mini-repository: http://gidzzz.mooo.com/maemo/.