Active Topics

 



Notices


Reply
Thread Tools
Posts: 479 | Thanked: 641 times | Joined on Dec 2007 @ Switzerland
#11
Originally Posted by nikolajhendel View Post
I can't install. pysqlite gives an error when trying to install: package missing - libsqlite0.....
Hmm, libsqlite0 should be installed when you install gpe-calendar.

In any case it is available from the Maemo-extras repository, which should already be configured in the repositories list. I really don't remember if on an out-of-the-box N800 maemo-extras is already configured?
 
Posts: 362 | Thanked: 145 times | Joined on Jan 2008 @ Sydney, Australia
#12
thanks lorelei
I was installing the other way round (Erminig first - gpe after).
Everything went smooth, installed GPE + Erminig.

This is really cool - sync is fantastic - and with GPE's home screen, it's a bliss
 
Posts: 348 | Thanked: 61 times | Joined on Dec 2007
#13
I don't know about the N810, but on the N800 there is a setting for auto capitalization. Control Panel, Text Input, check or uncheck Handwriting case correction. If it's checked, the first letter of a sentence is capitalized automatically, including pretty much every entry. If it's unchecked, that doesn't happen, at least on my device.
 

The Following User Says Thank You to sgosnell For This Useful Post:
Posts: 152 | Thanked: 32 times | Joined on Dec 2007 @ CA
#14
I just did it on the N810...way cool....
 
Posts: 11 | Thanked: 1 time | Joined on Jun 2008
#15
Many thanks for the pointers re cron and auto-sync'ing calendars overnight, will give it a try and let you know.
Regards
Paul
 
Posts: 11 | Thanked: 1 time | Joined on Jun 2008
#16
Many thanks for the pointers re cron and auto-sync'ing calendars overnight, will give it a try and let you know.
Regards
Paul
 
Posts: 459 | Thanked: 669 times | Joined on Sep 2007 @ The DMV
#17
I flashed to Diablo, and installing the new erminig package was much easier this time around. Thank you!

I did notice one potential bug: all day events in google are showing up one week late, once imported to GPE.
 
Posts: 479 | Thanked: 641 times | Joined on Dec 2007 @ Switzerland
#18
Originally Posted by klinglerware View Post
I did notice one potential bug: all day events in google are showing up one week late, once imported to GPE.
Hmmm, this one is new for me. Do you have step-by-step instruction to reproduce this? I never got reports about such a bug....
 
EIPI's Avatar
Posts: 794 | Thanked: 784 times | Joined on Sep 2007 @ /Canada/Ontario/GTA
#19
lorelei - thank you for taking up the erminig development and support. I know that the previous developer said that syncing GPE-Contacts to the Google contacts was difficult, and that he had no interest in it. Based upon your experience with erminig and the Google API to date, does such a sync for the contacts appear feasible? Thanks again for picking up the erminig support and development!
__________________
Mobile Tablets Blog
Follow me on
Twitter

 
Posts: 459 | Thanked: 669 times | Joined on Sep 2007 @ The DMV
#20
Originally Posted by lorelei View Post
Hmmm, this one is new for me. Do you have step-by-step instruction to reproduce this? I never got reports about such a bug....
Yes, this seems to affect all-day events originally created in GPE. This was particularly noticeable on recurring, non-weekly events (for example, bi-weekly or every three weeks events). (I reflashed without backing up--I didn't care because I knew that my GPE calendar was backed up via google. So, I used erminig to recreate my GPE calendar upon reflash). Anyway, this would be an approximation of what happened:

1. Create an all day event in GPE (typically for me, something scheduled to recur once every three weeks), in Chinook
2. Run the old version of erminig to synchronize GPE & Google
3. Reflash tablet to Diablo
4. Re-install GPE, start with blank slate calendar
5. Install latest version of erminig
6. Re-import all day event from google using erminig

Hope that helps. Let me know if you need more detail.
 