here.david
|
2008-05-14
, 07:57
|
Posts: 152 |
Thanked: 32 times |
Joined on Dec 2007
@ CA
|
#31
|
|
2008-05-22
, 20:33
|
Posts: 148 |
Thanked: 20 times |
Joined on Sep 2007
|
#32
|
|
2008-05-22
, 21:46
|
Posts: 66 |
Thanked: 6 times |
Joined on Apr 2008
|
#33
|
|
2008-05-22
, 22:06
|
Posts: 152 |
Thanked: 32 times |
Joined on Dec 2007
@ CA
|
#34
|
Can you elaborate on how you got it to work in both directions? I have it working down but not back up to google.
|
2008-05-22
, 22:51
|
Posts: 130 |
Thanked: 13 times |
Joined on Dec 2007
|
#35
|
|
2008-05-23
, 14:37
|
Posts: 2 |
Thanked: 0 times |
Joined on May 2008
|
#36
|
|
2008-05-23
, 15:56
|
Posts: 38 |
Thanked: 2 times |
Joined on Apr 2008
@ Colombia
|
#37
|
|
2008-05-23
, 17:55
|
Posts: 130 |
Thanked: 13 times |
Joined on Dec 2007
|
#38
|
|
2008-05-23
, 18:38
|
Posts: 80 |
Thanked: 22 times |
Joined on Apr 2008
@ South Florida
|
#39
|
|
2008-05-24
, 19:45
|
Posts: 148 |
Thanked: 20 times |
Joined on Sep 2007
|
#40
|
I didnot have the starting problem either, and all was well with my outlook 2 google 2 gpe (via erminig) until I added a us holidays calendar from icalshare.com into outlook.
It appears there is an erminig issue with how it imports the data from google.
Holidays are correct in outlook, and google - but my GPE has memorial day on saturday 5/31 (not the 26th), and fathers day on 6/19 (not on 6/15) and the like. Odd thing - Flag day 6/14 is correct...
Ideas?