![]() |
2010-01-18
, 21:55
|
Posts: 76 |
Thanked: 12 times |
Joined on Sep 2009
@ USA
|
#41
|
![]() |
2010-01-18
, 21:57
|
Posts: 168 |
Thanked: 265 times |
Joined on Oct 2009
@ London, UK
|
#42
|
![]() |
2010-01-18
, 22:25
|
Posts: 479 |
Thanked: 641 times |
Joined on Dec 2007
@ Switzerland
|
#43
|
That said, is there anything other than feedback that the community can give you to help this along?
The Following User Says Thank You to lorelei For This Useful Post: | ||
![]() |
2010-01-19
, 03:19
|
Posts: 459 |
Thanked: 669 times |
Joined on Sep 2007
@ The DMV
|
#44
|
The Following User Says Thank You to klinglerware For This Useful Post: | ||
![]() |
2010-01-19
, 11:14
|
Posts: 3 |
Thanked: 0 times |
Joined on Jan 2010
|
#45
|
Another good thing to have, some kind of "standardized" test suite, in order to ease the testing of all the aspects of the calendar sync.
![]() |
2010-01-19
, 11:36
|
Posts: 729 |
Thanked: 155 times |
Joined on Dec 2009
|
#46
|
hmmm, maybe ideas for how the GUI should look like (just a raw sketch)...
At the beginning I was planning to have the interface similar to the original Erminig (http://maemo.org/downloads/product/OS2008/erminig/), but I'm open to new ideas, provided they are doable
Another good thing to have, some kind of "standardized" test suite, in order to ease the testing of all the aspects of the calendar sync.
![]() |
2010-01-19
, 15:28
|
Posts: 22 |
Thanked: 6 times |
Joined on Dec 2009
@ Utrecht, the Netherlands
|
#47
|
![]() |
2010-01-19
, 16:13
|
Posts: 479 |
Thanked: 641 times |
Joined on Dec 2007
@ Switzerland
|
#48
|
![]() |
2010-01-19
, 16:19
|
Posts: 22 |
Thanked: 6 times |
Joined on Dec 2009
@ Utrecht, the Netherlands
|
#49
|
![]() |
2010-01-19
, 16:34
|
Posts: 130 |
Thanked: 13 times |
Joined on Nov 2005
|
#50
|
![]() |
Tags |
erminig, erminig-ng, ernie nig, google calendar, google sync, synchronization |
|