![]() |
2010-06-13
, 22:01
|
Posts: 141 |
Thanked: 51 times |
Joined on May 2010
@ Netherlands
|
#2
|
The Following User Says Thank You to pthomas22 For This Useful Post: | ||
![]() |
2010-06-13
, 22:06
|
|
Posts: 963 |
Thanked: 626 times |
Joined on Sep 2009
@ Connecticut, USA
|
#3
|
The Following User Says Thank You to rm42 For This Useful Post: | ||
![]() |
2010-06-13
, 22:10
|
Posts: 466 |
Thanked: 335 times |
Joined on Jan 2010
@ Vienna, Austria
|
#4
|
![]() |
2010-06-13
, 22:24
|
Posts: 352 |
Thanked: 231 times |
Joined on Jul 2008
@ Vancouver
|
#5
|
The Following User Says Thank You to timwatt For This Useful Post: | ||
![]() |
2010-07-14
, 21:57
|
Posts: 466 |
Thanked: 335 times |
Joined on Jan 2010
@ Vienna, Austria
|
#6
|
I'd like to know which are currently my options for syncing my calendar entries (from the Maemo PR 1.2 pre-installed calendar) directly with online services such as google calendar (Which i don't use though, but I might, if that was the only one that N900 syncs with). OVI calendar is still not supported I guess?
Right now, typing "calendar" in the app manager only brings up the GPE cal, but i can't figure out whether that has a syncing functionality. Typing "sync" doesn't get any results. (I currently don't have Extras Testing and Devel enabled and definitely don't wish to install stuff that's still in devel. I'm no programmer, just a regular user.)
Any hints are greatly appreciated.
Thanks, Ben