![]() |
2007-01-15
, 17:53
|
Posts: 4 |
Thanked: 0 times |
Joined on Jan 2007
|
#2
|
![]() |
2007-01-18
, 15:13
|
Posts: 5 |
Thanked: 0 times |
Joined on Dec 2006
|
#3
|
Is it possible to change the day the calendar starts each week to Sunday? My work week goes from Sun to Sat and I would like my calendar to reflect this. I have yet to find a setting in GPE - am I missing something? I have looked at winzig and even though the config file is reflecting the desired setting, it still won't show the calendar with a Sunday start date either. Is this a system setting somewhere? Doesn't seem likely, but....
Thanks in advance!